Y connection 60E/F

To connect 2 Tubes to an output of the Command 60E Pro.
When the maximum flow rate of the installation is between 120 and 180 l/min (7.2 and 10.8 m3/h), one Y is needed to connect the third Tube 60F.
When the maximum flow rate of the installation is between 180 and 240 l/min (10.8 and 14.4 m3/h), two Y are needed to connect the third and fourth Tube 60F.
Art. n° 83010






