Contactez-nous

partie centrale qui "pousse"

Y connection 60E/F

Y connection 60E/F

To connect 2 Tubes to an output of the Command 60E Pro.

When the maximum flow rate of the installation is between 120 and 180 l/min (7.2 and 10.8 m3/h), one Y is needed to connect the third Tube 60F.

When the maximum flow rate of the installation is between 180 and 240 l/min (10.8 and 14.4 m3/h), two Y are needed to connect the third and fourth Tube 60F.

 

Art. n° 83010

Synchronisation cable

Cable needed for the synchronisation of several Command 60E Pro and / or Command 360E Pro to one another.

Length > 7 m made to measure (max. 200 m)

 

Art. n° 83400   Length 7m

Assembly kit for a DIN rail 60E

Assembly kit for a DIN rail 60E

Fixation items for DIN strips.
Allows the Command 60E Pro to be easily fixed to a DIN rail.

 

Art. n° 83500

Extensions for Tubes 60E/F

Extensions for Tubes 60E/

When the Command 60E Pro is placed at over a metre from the Tubes 60F, an extension is required.

 

Art. n° 83200   Length 5 m
Art. n° 83201   Length 10 m
Art. n° 83202   Length 15 m
Art. n° 83203   Length 30 m
Art. n° 83204   Length 50 m

Adapter box 60E/F 30-50m

When a 30 or 50 m extension is used, the Command 60E Pro has to be reprogrammed.

In such a case, an especially made adapter box must be used between the Command and the Tube(s) which don’t use a 30 or 50 m extension.

 

Art. n° 83209