Y connection 360E/F

To connect 2 Tubes to an output of the Command 360E Pro.
When the maximum flow rate of the installation is between 1080 and 1440 L/min (64.8 and 86.4 m3/h), a Y connection is needed to connect the fourth Tube 360F.
When the maximum flow rate of the installation is between 1440 and 1800 L/min (86.4 and 108 m3/h), two Y connections are needed to connect the fourth and fifth Tube 360F.
When the maximum flow rate of the installation is between 1800 and 2160 L/min (108 and 129.6 m3/h), three Y connections are needed to connect the fourth, fifth and sixth Tube 360F.
Art. n° 83020






