Contactez-nous

partie centrale qui "pousse"

Y connection 360E/F

Y connection 360E/F

To connect 2 Tubes to an output of the Command 360E Pro.

When the maximum flow rate of the installation is between 1080 and 1440 L/min (64.8 and 86.4 m3/h), a Y connection is needed to connect the fourth Tube 360F.

When the maximum flow rate of the installation is between 1440 and 1800 L/min (86.4 and 108 m3/h), two Y connections are needed to connect the fourth and fifth Tube 360F.

When the maximum flow rate of the installation is between 1800 and 2160 L/min (108 and 129.6 m3/h), three Y connections are needed to connect the fourth, fifth and sixth Tube 360F.

 

Art. n° 83020

Assembly kit for a DIN rail 360E

Assembly kit for a DIN rail 360E

Fixation items for DIN strips.
Allows the Command 360E Pro to be easily fixed to a DIN rail.

 

Art. n° 83510

Extensions for Tubes 360E/F

Extensions for Tubes 360E/F

When the Command 360E Pro is placed at over two metres from the Tubes 360F, an extension is required

Length > 15 m made to measure (max. 50 m)

 

Art. n° 83210   Length 5 m
Art. n° 83211   Length 10 m
Art. n° 83212   Length 15 m

Synchronisation cable

Cable needed for the synchronisation of several Command 60E Pro and / or Command 360E Pro to one another.

Length > 7 m made to measure (max. 200 m)

 

Art. n° 83400   Length 7m