You are here: Systems > Living spaces & irrigation > Tube 360 II
FrançaisEnglishDeutschItalianoEspanol
11/21/2008 : 7:08 am : +0100

Systems

Standard settings (for buildings and irrigation)

  • Aqua-4D® 60 for max. 60 L/min or 3,6 m3/h (max 3 apartments), incl 1 command 60 + 1 tube 60
  • Aqua-4D® 120 for max. 120 L/min or 7,2 m3/h (max 7 apartments), incl 1 command 60 + 2 tubes 60
  • Aqua-4D® 180 for max. 180 L/min or 10,8 m3/h (max 15 apartments), incl 1 command 60 + 3 tubes 60
  • Aqua-4D® 240 for max. 240 L/min or 14,4 m3/h (max 25 apartments), incl 1 command 60 v.4 TU + 4 tubes 60
  • Aqua-4D® 360 H for max. 360 L/min or 21,6 m3/h (max 40 apartments), incl 1 command 360 H + 1 tube 360

Technical data Tube 360 II

  • Length: 80.4 cm
  • Length with raccords : 88.9 cm
  • Inside diameter : 2 pouces
  • Weight with raccords : 8.7 kg
  • Operational temperature : max. 60 [°C]
  • Flow rate max. : 360 l / min. (21.6 m3 / h) at  3 bar pressure
  • Pressure lost max. 20 bar, Druckverlust bei V max. = 0.07 bar
  • Material : PVC-C, TC-Quickpipe, Thermoconcept GmbH & Co.
  • Permissions : SVGW t


Installation of Tube 360 II

Caution:
The installation must be made by sanitary installators or other professional of the branch.

  • The assembly of the series of Aqua-4D® appliances is done in general after the water meter.
  • The assembly of the tube in control is made with the arrow in the direction of the water run-off.
  • The Tube 360 II can be assembled horizontally or vertically, in flow going up or going down.
  • No mechanical intervention must be made on Tube 360.

Caution:
To pay attention to the equalization of the different potentials. If necessary, to connect the control of an end to the other of the tube with a copper wire (EP 3mm2 CU green/yellow)

  • Not to install the tube in the vicinity immediate of apparatuses such electric control panels, transformer, or other electric installations of equivalent or higher power.
  • The Tube 360 II must be assembled after treatment UV as well as the pumps.
  • For large buildings, we propose to install: a bypass witch arrived principal as well as a second system in the hot water circulation with 2 valves before and after the tube.